Dell & HPE Original Hardware
We plan Dell PowerEdge and HPE ProLiant server configurations according to workload, capacity and growth requirements, and evaluate warranty and support options within the quotation scope.
We don't just sell hardware; we deliver guaranteed server infrastructures correctly configured for your company's 5-year growth targets.
We plan Dell PowerEdge and HPE ProLiant server configurations according to workload, capacity and growth requirements, and evaluate warranty and support options within the quotation scope.
We construct RAID 1, 5, or 10 architecture against disk failures; enabling instant replacement of a failed disk without data loss.
We join all computers to a central domain and manage folder permissions and security rules (Group Policy) from a single server screen.
We deliver your next-gen server systems ready for VMware vSphere or Microsoft Hyper-V virtualization layers (Cluster Ready).
We perform periodic fan, thermal paste, firmware, and disk health checks; and perform RAM/Disk upgrades when necessary.
Reach the senior engineer who built and knows your system directly during server access or hardware crises, without waiting for tickets.
Choosing the right server is not just about selecting a processor and disk capacity. Workloads, user count, applications, virtualization, redundancy, growth and the support model should be evaluated together.
We evaluate workloads such as ERP/CRM, file servers, databases, application servers, Active Directory and virtual machines together.
We size CPU core architecture, RAM capacity, disk type, capacity and performance requirements according to current needs and expected growth.
RAID, hot spare, redundant power supplies and, when required, backup/virtualization architectures are evaluated together.
We prepare server proposals not only for current needs but also for the organization’s growth plan and application workloads. CPU, RAM, disk capacity, storage performance, RAID architecture, network connectivity and virtualization requirements are evaluated together.
Enterprise server pricing is not determined by a single model or user count. Hardware selection, licenses, warranty package, installation and support scope affect the total proposal cost.
For a new server or an upgrade to an existing system, the following information helps speed up the initial technical assessment:
Professional enterprise services on Dell EMC, HPE ProLiant, Windows Server, Linux Server, and hardware infrastructures.
Hardware configuration, supply, deployment and iDRAC management setup for Dell PowerEdge rack and tower server families.
Supply of HPE ProLiant DL, ProLiant DL, and ProLiant ML servers, iLO remote access setup, and installation.
Building RAID 1, RAID 5, RAID 10 disk architectures via PERC and Smart Array hardware RAID cards.
Windows Server 2022/2025 Domain Controller, DNS, DHCP, GPO, and department-authorized shared file access.
Original RAM addition, Enterprise SSD/SAS disk upgrade, and Redundant power supply installation for your existing servers.
Annual contracted server maintenance; hardware cleaning, updates, log checks, and on-site support commitment.
Ubuntu, RedHat, and Debian server installation, web/database server configuration, and security hardening.
Correct server hardware, virtual CPU/RAM ratio design prior to VMware vSphere or Hyper-V installations.
CPU and RAM are not enough by themselves; review form factor, storage, networking, remote management, power redundancy and support on the same BOM.
Rack space, office/branch use, noise and expansion requirements affect form factor.
Evaluate 3–5 years of growth as well as current workload, slots and socket architecture.
Capacity, latency and IOPS are evaluated together. RAID provides disk-failure tolerance; it does not replace independent backup.
Plan NIC count, 1/10/25 GbE, VLANs and any storage/HBA connectivity with the existing switching environment.
Define the licensing level needed for remote console, hardware health, firmware and management.
Evaluate redundant PSUs, UPS and PDU connections together with server-room power infrastructure.
Warranty term, vendor support level and critical-parts availability belong in total cost of ownership.
A new server should be planned together with repository capacity, restore testing and RPO/RTO targets.
Continue with the relevant technical guide, product/licensing page or project scenario.
A server proposal should translate application requirements into CPU, memory, storage, network and resiliency needs. Virtualization density, database behavior and backup windows can materially change the required configuration.
Core count, clock requirements and virtualization density should match the applications to be hosted.
Current usage, VM growth and application cache behavior should be considered when sizing RAM.
Capacity alone is not enough; latency, IOPS, RAID level and usable capacity should be evaluated together.
Power supplies, network paths, storage redundancy and independent backup should be planned as separate resilience layers.
Key questions about server procurement, installation, sizing and maintenance.
The choice should be evaluated according to workload, existing infrastructure, management tools, warranty and support expectations, and budget. Rather than treating one brand as superior in every scenario, sizing should be based on the actual use case.
User count alone is not sufficient. CPU, RAM, storage performance and capacity, applications, databases, virtualization, redundancy and growth plans should be evaluated together.
No. RAID can provide redundancy and availability against disk failures in suitable scenarios; backup must still be planned separately for deletion, corruption, malware and broader data-loss scenarios.
Depending on the project scope, physical installation, RAID and disk configuration, iDRAC/iLO, Windows Server or Linux installation, Active Directory, DNS/DHCP, File Server, security hardening and basic testing/documentation steps can be planned.
Yes. Server sizing and capacity planning can be performed according to the number of virtual machines, CPU/RAM resources, storage capacity and performance, and expected growth.
Depending on hardware compatibility, vendor support status and current capacity, upgrade options for RAM, disks, SSDs, RAID and some power components can be evaluated.
Depending on project scope, product supply, license renewal, deployment, migration and commissioning can be planned together.